Following the successful tender design and as a senior member of the design teamĀ allocated the design development of the super and substructure solution of the 110metre long continuous pre-stressed Chapel Street Eastbound Off Ramp Bridge (CESBOR) spanning the periphery of the Waikareao Estuary. This bridge saw the first use of self-compacting concrete for super T girders on a State …
Hale Street Link, Go-Between Bridge
Hale Street Link Alliance, alliance comprising of Hyder, Bouygues Travaux Public, McMahon, Seymour Whyte and Brisbane City Council tasked with the delivery of the tolled crossing of the Brisbane river. With a focus was on detailed design refinement on the twin 274m long insitu concrete balance cantilevered bridges and ancillary structures …

