Harthope Viaduct, West Coast Mainline Route Modernisation
Independent design verificationon this continuous steel/composite U-framed railway structure. Involving the successful delivery of the permanent works detailed design check and approval (Form A/B) for the super and substructures including dynamic analysis for this 88.5metre structure in accordance with Network Rails (Railtrack) group and line standards. This involved the adoption of value engineering workshop recommendations within the design and the … Continue reading Harthope Viaduct, West Coast Mainline Route Modernisation
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed