SH16 Te Atatu Intechange Upgrade (Peer review)

Leading the independent verification (IV) of the successful design for the structural modification of the existing interchange addressing capacity upgrading and safety improvements. This project included legacy structures that require remedial measures to secure structural performance of the interchange due to alkali aggregate reaction (AAR) to safe guard their intended design life. Solutions utilise external post tensioning to improve both … Continue reading SH16 Te Atatu Intechange Upgrade (Peer review)