Leighton Downer JV, as the structures team leader I provided technical leadership for construction stage problem solving for large diameter bored pile retaining walls, piled sign gantry structures, 12No. bridge structures and. This included the sweeping 320m long multispan Reboubt road flyover. I had a key role on the design delivery to the JV creating clear channels for communication and technical issue resolution, design reporting, deliverable checking, design certification and building consent application packages.
